← Back to resources

Why we invested in TerraWave

Why we investedNov 20, 2026 · 3 min read

Before Square One Labs wrote TerraWave’s first check in 2024, I asked co-founder and CEO Hagay Carmi how a steel drill pipe ten kilometers long would support its own weight. He walked me through how much strength the steel would retain at high temperatures and how the surrounding drilling fluid would help carry the load. He was equally clear about which calculations the team still needed to run.

The reason we cared about that pipe was simple. If you can afford to drill deep enough to reach hot rock, places that have never had access to geothermal power could generate clean electricity around the clock. We worked through the physics with the founders, down to whether measurements taken at one frequency supported their assumptions at another. We came away convinced that the concept rested on established science. The challenge was getting the whole system to work kilometers underground.

What stood out to us was how much thought the founders had given to getting the rock out of the hole. A drill can only advance as fast as it can break the rock and clear it. Crews have used circulating fluid for decades to carry material to the surface, cool their tools, and keep the well stable. TerraWave built on that experience and reimagined what happens at the rock face. Its system now uses a laser to break up or melt hard rock. Clearing that material continuously could let crews drill more meters a day. Eliminating the mechanical bit could also spare them the time it takes to pull kilometers of pipe to replace a worn tool. Together, those two gains could change the cost of a deep geothermal well.

That combination also explains why we backed these founders. Hagay had led engineering teams that deployed complex systems in the field. Michael Pechatnikov and Vadim Zlotnik had already built VisionMap together, bringing optics, mechanics, and software into a single aerial mapping system. TerraWave needed people who knew how to make those disciplines work together and could bring that experience to the unfamiliar problem of drilling in extreme heat.

We led the seed round because of what we saw after that first check. By then the team had beaten its early technical milestones and drilled a bore nearly nine centimeters wide in the lab. Their progress since then shows how they work. They tested both millimeter waves and lasers, then chose the laser because they saw a lower-cost, faster path to the field. In September 2026 they drilled a full meter into basalt with the laser, three months ahead of plan. As a board member, I’ve watched how quickly they turn one result into the next test. They’re now preparing for a 20-meter outdoor demonstration.

When we first invested, Fervo’s geothermal project in Nevada was already supplying the grid that serves Google’s data centers. In September 2026, Google signed a 396-megawatt geothermal power agreement with Fervo. Buyers are committing to round-the-clock clean power at a scale the industry could only aspire to a few years ago. Our bet is that if TerraWave can bring down the cost of reaching deep heat, many more places will be able to supply it.